The West African Gas Pipeline Company (WAPCo), operator of the West African Gas Pipeline (WAGP) system has been forced to shut off gas receipts into its pipeline.

The gas that was being received at the company’s Itoki Receipt terminal exceeded allowable gas specifications for moisture content and that could be detrimental to the integrity of the pipeline system. WAPCo is in discussions with suppliers to ensure the situation is reversed within the shortest possible time”